BACKGROUND JOB FAILED - Help Urgent

Moderators: BASIS24x7, Rashed

Post Reply
vasu
Posts: 1

BACKGROUND JOB FAILED - Help Urgent

Post by vasu »

Hi everyone , I am vasu from Malaysia. I'm Mr Rasheed Student back in december. I need your guys help in this issue. I am doing daily monitoring.

In SM37 when i checked for Terminated or cancel jobs everyday i have the following program cancelled.

Job Name :
EU_PUT JSPC Canceled
EU_REORG JSPC Canceled

When i click on the Job Log i have the following message.

Job started
Logon of user JSPC in client 800 failed when starting a step
Job cancelled

Is this something normal or i have to troubleshoot to resolve the problem. I really would appreciate a prompt reply from you guys. Thank you so much .
rukku
Posts: 39

Re: BACKGROUND JOB FAILED - Help Urgent

Post by rukku »

Unlock user JSPC in client 800
check authorizations for JSPC
Ravidusa
Posts: 2

Re: BACKGROUND JOB FAILED - Help Urgent

Post by Ravidusa »

there are two batch jobs cancelled in develpment

1)seedhex
2)swwerre

please give me answer as soon as possible
adivenkat
Posts: 1

Re: BACKGROUND JOB FAILED - Help Urgent

Post by adivenkat »

hi
this is ADI

go for transaction SCCL and select restart mode and schedule it as background, when background job failed on client copy u should have to log in 888 client using
username = sap*
password = pass

all the best vasu
Post Reply